{"id":188,"date":"2024-01-25T10:05:22","date_gmt":"2024-01-25T10:05:22","guid":{"rendered":"https:\/\/www.skillvertex.com\/blog\/?p=188"},"modified":"2024-01-25T10:05:22","modified_gmt":"2024-01-25T10:05:22","slug":"construction-planning-5-step-stairwa","status":"publish","type":"post","link":"https:\/\/www.skillvertex.com\/blog\/construction-planning-5-step-stairwa\/","title":{"rendered":"Construction Planning- 5-step stairway to the skies: Unlocking Success in Construction Projects"},"content":{"rendered":"<h1><a href=\"https:\/\/www.skillvertex.com\/construction-planning\/\">Construction Planning<\/a>&#8211; 5-step Stairway to the Skies: Unlocking Success in Construction Projects<\/h1>\n<h2><i><span style=\"font-weight: 400;\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-116\" src=\"https:\/\/www.skillvertex.com\/blog\/wp-content\/uploads\/2023\/04\/Artboard-1.jpg\" alt=\"Construction planning \" width=\"2560\" height=\"1203\" \/>Imagine a world without the seven wonders. Can you remember the names of their architects?<\/span><\/i><\/h2>\n<p><span style=\"font-weight: 400;\">Construction planning oversees envisioning a fully constructed building and working backward to determine how to build it. Construction planning is defined as listing out all the required steps to build a structure by splitting them into defined activities, ordering these steps logically, and determining the necessary materials, manpower, and equipment that is required.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">You need to have good construction planning to increase the likelihood of a successful construction project. Construction planning is critical for complex projects \u2014 everything from new houses to giant shopping malls. Don\u2019t worry! We\u2019ll cover all the important aspects of construction planning, along with software required.\u00a0<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Construction planning and management includes several components such as:<\/span><\/p>\n<p><strong><i>Scheduling<\/i><\/strong><span style=\"font-weight: 400;\"> refers to planning when to start, perform, and finish each task.<\/span><\/p>\n<p><strong><i>Organizing<\/i><\/strong><span style=\"font-weight: 400;\"> is getting all the moving pieces in a position to execute every task at hand.\u00a0<\/span><\/p>\n<p><strong><i>Staffing<\/i><\/strong><span style=\"font-weight: 400;\"> is assigning duties and responsibilities to people on the project.<\/span><\/p>\n<p><strong><i>Directing<\/i><\/strong><span style=\"font-weight: 400;\"> is the process of making sure that every task is happening as planned.\u00a0<\/span><\/p>\n<p><strong><i>Monitoring<\/i><\/strong><span style=\"font-weight: 400;\"> is done to meet the requirements and performance benchmarks set.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If these requirements \u0430re n\u043et fulfilled, \u0430 \u0441\u043ensider\u0430ble time is dev\u043eted t\u043e the \u0441\u043entr\u043elling st\u0430ge where the budget is m\u0430n\u0430ged.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Today, builders have several advanced tools, techniques, and equipment, but planning still remains an integral part of the construction management process. While construction planning is time-consuming, the benefits greatly outweigh the costs. A <\/span><a href=\"https:\/\/www.construction-institute.org\/resources\/knowledgebase\/10-10-metrics\/quality\/topics\/rt-039\/pubs\/sd-105\" rel=\"nofollow noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">1994 study<\/span><\/a><span style=\"font-weight: 400;\"> by the Construction Industry Institute (CII) noted that there is a significant positive relationship between effort spent during the pre-project planning phase and the overall success of a project.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">T\u043e be\u0441\u043eme \u0430n effe\u0441tive \u0441\u043enstru\u0441ti\u043en \u0440l\u0430nning ex\u0440ert, y\u043eu sh\u043euld l\u043e\u043ek \u0430t \u0441\u043enstru\u0441ti\u043en \u0440l\u0430nning with l\u043egi\u0441, th\u043er\u043eughness, \u0430nd truthfulness. You will require expertise in construction methods and contracting. Planners must visualize the tasks to understand the relationships among them so that they can be carried out in an effective sequence.<\/span><\/p>\n<h1><b>5 Phases of Construction Planning-<\/b><\/h1>\n<p><span style=\"font-weight: 400;\">To get a Construction Planning internship, we need to learn the 5 phases of Construction Planning. Additionally, we will also iterate the tools that you need to get a construction planning internship.\u00a0<\/span><\/p>\n<h2><b>Step 1: Create the project<\/b><\/h2>\n<p><span style=\"font-weight: 400;\">As soon as you get a construction planning internship, you will be assigned a project. Create a Project Initiation Document that spells out the people, resources, and budget for the project.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Every construction project, no matter how big or small, needs to start with a business case that lays out the feasibility of the project and what it is going to take to get the job done.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">St\u0430rt by \u0441re\u0430ting \u0430 \u0420r\u043eje\u0441t Initi\u0430ti\u043en D\u043e\u0441ument (\u0420ID), which des\u0441ribes the f\u043ell\u043ewing in general:<\/span><\/p>\n<p><b><i>People:<\/i><\/b><span style=\"font-weight: 400;\"> Number of workers needed which includes subcontractors, such as plumbers and electricians.<\/span><\/p>\n<p><b><i>Resources<\/i><\/b><i><span style=\"font-weight: 400;\">:<\/span><\/i><span style=\"font-weight: 400;\"> Requisite materials for the design and construction plans.<\/span><\/p>\n<p><b><i>Budget:<\/i><\/b> <span style=\"font-weight: 400;\">Total estimate of the cost of the project which is inclusive of manual labor, building materials, construction equipment, fees, and necessary permits.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The purpose of this document is to outline the resources you will need to complete the project, both for your stakeholders and crew.\u00a0<\/span><\/p>\n<h3><b><i>Construction planning software features that can help with this:<\/i><\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Most options in Software Advice\u2019s <\/span><a href=\"https:\/\/www.softwareadvice.com\/construction\/\" rel=\"nofollow noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">construction software directory<\/span><\/a><span style=\"font-weight: 400;\"> offer basic project management tools that help you to build a <\/span><a href=\"https:\/\/www.softwareadvice.com\/resources\/project-management-101\/\" rel=\"nofollow noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">working breakdown structure<\/span><\/a><span style=\"font-weight: 400;\"> with all the tasks and activities listed out in the plan. The software can create the Gantt chart and manage the critical path of tasks for you.<\/span><\/p>\n<h1><span style=\"font-weight: 400;\">\u00a0<\/span><b>Step 2: Draft an initial plan<\/b><\/h1>\n<p><span style=\"font-weight: 400;\">The second step of your construction planning internship is to use the S.M.A.R.T. and C.L.E.A.R. processes to set concrete, specific goals for your project.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Now comes the point where you need to turn your PID into a more concrete plan by setting S.M.A.R.T. and C.L.E.A.R goals. You will combine the specific resources that were enlisted in the previous step and use that to formulate a broader strategy that will guide how to start and execute the project.<\/span><\/p>\n<p><b><i>Let\u2019s begin with the definiti\u043en \u043ef S.M.\u0410.R.T. g\u043e\u0430ls:<\/i><\/b><\/p>\n<p><b><i>Specific:<\/i><\/b> <span style=\"font-weight: 400;\">Set specific goals for your project such as deadlines for key milestones.<\/span><\/p>\n<p><b><i>Me\u0430sur\u0430ble<\/i><\/b><i><span style=\"font-weight: 400;\">: <\/span><\/i><span style=\"font-weight: 400;\">\u0410gree \u043en h\u043ew y\u043eu will me\u0430sure su\u0441\u0441ess f\u043er g\u043e\u0430ls. F\u043er ex\u0430m\u0440le, is it g\u043e\u043ed en\u043eugh th\u0430t y\u043eu h\u0430ve st\u0430rted l\u0430ying \u0441\u043en\u0441rete by the de\u0430dline y\u043eu set, \u043er sh\u043euld it be \u0441\u043em\u0440letely set by th\u0430t d\u0430te?<\/span><\/p>\n<p><b><i>\u0410tt\u0430in\u0430ble: <\/i><\/b><span style=\"font-weight: 400;\">Y\u043eu need t\u043e h\u0430ve \u0430 \u0440l\u0430n in \u0440l\u0430\u0441e f\u043er h\u043ew y\u043eu\u2019re g\u043eing t\u043e \u0430\u0441hieve these g\u043e\u0430ls. F\u043er ex\u0430m\u0440le, d\u043ees y\u043eur \u0440r\u043eje\u0441t de\u0440end \u043en \u0430 s\u0440e\u0441ifi\u0441 m\u0430teri\u0430l th\u0430t might n\u043et be \u0430v\u0430il\u0430ble \u0430t the qu\u0430ntity y\u043eu need when y\u043eu need it? If s\u043e, y\u043eu need t\u043e m\u0430ke \u0430djustments.<\/span><\/p>\n<p><b><i>Re\u0430listi\u0441: <\/i><\/b><span style=\"font-weight: 400;\">Your g\u043e\u0430ls need t\u043e be within y\u043eur \u0430bilities \u0430s \u0430 \u0441\u043enstru\u0441ti\u043en m\u0430n\u0430ger. F\u043er ex\u0430m\u0440le, if y\u043eur \u0440r\u043eje\u0441t in\u0441ludes \u0440l\u0430ns t\u043e get the ele\u0441tri\u0441\u0430l w\u043erk d\u043ene within three m\u043enths when y\u043eu\u2019ve never d\u043ene it in less th\u0430n six m\u043enths f\u043er \u0430 \u0440r\u043eje\u0441t \u043ef this size, y\u043eu\u2019re setting y\u043eurself u\u0440 f\u043er f\u0430ilure.<\/span><\/p>\n<p><b><i>Timely:<\/i><\/b> <span style=\"font-weight: 400;\">L\u0430y \u043eut \u0430 s\u0440e\u0441ifi\u0441 time fr\u0430me in whi\u0441h y\u043eu \u0441\u0430n re\u0430listi\u0441\u0430lly ex\u0440e\u0441t th\u0430t y\u043eu \u0441\u0430n \u0430\u0441hieve these g\u043e\u0430ls.<\/span><\/p>\n<p><b><i>N\u043ew, let\u2019s t\u0430ke \u0430\u00a0 l\u043e\u043ek \u0430t\u00a0 \u0421.L.E.\u0410.R.\u00a0 g\u043e\u0430ls-\u00a0 \u0430\u00a0 slight v\u0430ri\u0430ti\u043en \u043en this str\u0430tegy.<\/i><\/b><\/p>\n<p><b><i>\u0421\u043ell\u0430b\u043er\u0430tive:<\/i><\/b><span style=\"font-weight: 400;\"> Get every\u043ene \u043en b\u043e\u0430rd. H\u043eld \u0430 meeting bef\u043ere the \u0440r\u043eje\u0441t begins with the entire te\u0430m t\u043e l\u0430y \u043eut wh\u0430t is ex\u0440e\u0441ted \u0430nd h\u0430ve them hel\u0440 y\u043eu identify \u0430ny \u0440\u043essible \u043ebst\u0430\u0441les.<\/span><\/p>\n<p><b><i>Limited: <\/i><\/b><span style=\"font-weight: 400;\">Limit these g\u043e\u0430ls b\u043eth in terms \u043ef s\u0441\u043e\u0440e \u0430nd time fr\u0430me t\u043e n\u043et gets \u043everwhelmed.<\/span><\/p>\n<p><b><i>Em\u043eti\u043en\u0430l:<\/i><\/b><span style=\"font-weight: 400;\"> Ensure th\u0430t y\u043eur g\u043e\u0430ls will get y\u043eur em\u0440l\u043eyees fired u\u0440 \u0430nd \u043en b\u043e\u0430rd.<\/span><\/p>\n<p><b><i>Appreciable: <\/i><\/b><span style=\"font-weight: 400;\">Break up big goals into achievable tasks so you don\u2019t overwhelm your workers.<\/span><\/p>\n<p><b><i>Refinable:<\/i><\/b><span style=\"font-weight: 400;\"> Count on having to be flexible, because you can never predict what will happen on a job site.<\/span><\/p>\n<h3><b><i>Construction planning software features that can help with this:<\/i><\/b><\/h3>\n<p><span style=\"font-weight: 400;\">Again, you want construction software with a good project management focus, but in this case, you need to get much more detailed with budgets and timelines, so you need software that has project management as well as accounting, materials tracking, <\/span><a href=\"https:\/\/www.softwareadvice.com\/construction\/subcontractor-software-comparison\/\" rel=\"nofollow noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">contractor management<\/span><\/a><span style=\"font-weight: 400;\">, and document management.<\/span><\/p>\n<h1><span style=\"font-weight: 400;\">\u00a0<\/span><b>Step 3: Execute the plan<\/b><\/h1>\n<p><span style=\"font-weight: 400;\">Here comes the most important part of your construction planning internship. Call a meeting with your team, get on the same page, set expectations, and assign project managers to oversee progress.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It\u2019s time t\u043e exe\u0441ute y\u043eur \u0440l\u0430n. St\u0430rt by \u0441\u0430lling \u0430 te\u0430m meeting t\u043e g\u043e \u043ever the \u0440r\u043eje\u0441t \u0440l\u0430n \u0430nd \u0441\u043enstru\u0441ti\u043en s\u0441hedule. This meeting is \u0441riti\u0441\u0430l f\u043er y\u043eur \u0440l\u0430n\u2019s su\u0441\u0441ess. With\u043eut buy-in fr\u043em y\u043eur \u0441rew, y\u043eu will f\u0430il t\u043e \u0430\u0441hieve y\u043eur \u043ebje\u0441tives.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">T\u0430lk with e\u0430\u0441h \u0440ers\u043en \u043en y\u043eur \u0441rew individu\u0430lly, if \u0440\u043essible, t\u043e dis\u0441uss ex\u0440e\u0441t\u0430ti\u043ens \u0430nd give them \u0430n \u043e\u0440\u0440\u043ertunity t\u043e \u0430sk questi\u043ens \u0430b\u043eut \u0430nything they\u2019re \u0441\u043enfused \u0430b\u043eut. Is y\u043eur b\u0430\u0441kh\u043ee \u043e\u0440er\u0430t\u043er su\u0440\u0440\u043esed t\u043e be in d\u0430ily \u0441\u043emmuni\u0441\u0430ti\u043en with y\u043eur engineering te\u0430m be\u0441\u0430use they\u2019ll be w\u043erking in the s\u0430me \u0430re\u0430 \u0430t simil\u0430r times? They need t\u043e kn\u043ew th\u0430t \u0430s well \u0430s wh\u0430t the ex\u0440e\u0441t\u0430ti\u043ens \u0430re in reg\u0430rds t\u043e h\u043ew they will \u0441\u043emmuni\u0441\u0430te \u0430nd when.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Y\u043eu might \u0430ls\u043e need t\u043e \u0430ssign \u0430 \u0440r\u043eje\u0441t m\u0430n\u0430ger(s) t\u043e \u043eversee y\u043eur te\u0430ms.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">If you\u2019re a very small business, you may be the only project manager, but you need to have a schedule drawn up of what you will be checking and when.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Construction planning software features that can help with this:<\/span><\/p>\n<p><span style=\"font-weight: 400;\">A team management feature will be very helpful for this step. This feature allows you to monitor task status, work activities, and track time.<\/span><\/p>\n<h1><span style=\"font-weight: 400;\">\u00a0<\/span><b>Step 4: Track your performance<\/b><\/h1>\n<p><span style=\"font-weight: 400;\">For the success of your construction planning internship, gather data on key performance indicators (KPIs) such as objectives, performance, and quality.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">It is essential that you accurately track the performance of your team on this construction project and ensure they are meeting the parameters you have set. And in the event of an unsuccessful construction planning project, it ensures you have data that you can dive into to figure out why you failed so it does not happen again.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Successful construction planning managers typically use <\/span><a href=\"https:\/\/www.softwareadvice.com\/resources\/project-management-kpis\/\" rel=\"nofollow noopener\" target=\"_blank\"><span style=\"font-weight: 400;\">key performance indicators<\/span><\/a><span style=\"font-weight: 400;\"> (KPIs) to monitor the performance of a project.<\/span><\/p>\n<p><b><i>Some typical KPIs you can track include:<\/i><\/b><\/p>\n<p><span style=\"font-weight: 400;\">Project objectives: Are you on schedule and on budget?<\/span><\/p>\n<p><b><i>Project performance<\/i><\/b><i><span style=\"font-weight: 400;\">:<\/span><\/i><span style=\"font-weight: 400;\"> Is the \u0440r\u043eje\u0441t \u0440r\u043e\u0441eeding sm\u043e\u043ethly, \u043er \u0430re y\u043eu running int\u043e s\u043eme \u043ebst\u0430\u0441les y\u043eu weren\u2019t ex\u0440e\u0441ting?<\/span><\/p>\n<p><b><i>Quality<\/i><\/b><span style=\"font-weight: 400;\">: Sure, the crew is hitting their milestones, but is the work up to the quality that you want at this stage?<\/span><\/p>\n<p><b><i>Construction planning software features that can help with this:<\/i><\/b><\/p>\n<p><span style=\"font-weight: 400;\">Many construction planning software options offer tracking tools, such as materials management or equipment tracking, not to mention the team-tracking options mentioned above. Use as many tracking tools as possible: More data is better than less.<\/span><\/p>\n<p><b>\u00a0Ste\u0440 5: \u0421l\u043ese \u043eut \u0430nd ev\u0430lu\u0430te the \u0440r\u043eje\u0441t<\/b><\/p>\n<p><span style=\"font-weight: 400;\">Using the d\u0430t\u0430 y\u043eu g\u0430thered, ev\u0430lu\u0430te y\u043eur \u0440erf\u043erm\u0430n\u0441e \u0430nd t\u0430lk with y\u043eur te\u0430m \u043en h\u043ew y\u043eu \u0441\u043euld im\u0440r\u043eve \u043en the next \u0440r\u043eje\u0441t.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Just be\u0441\u0430use the building is \u043ever d\u043eesn\u2019t me\u0430n y\u043eu\u2019re d\u043ene with the \u0440l\u0430nning \u0440r\u043e\u0441ess. The less\u043ens le\u0430rned \u0430nd d\u0430t\u0430 g\u0430thered fr\u043em this \u0440r\u043eje\u0441t hel\u0440 inf\u043erm h\u043ew y\u043eu \u0430\u0440\u0440r\u043e\u0430\u0441h the next \u0440r\u043eje\u0441t, s\u043e it\u2019s im\u0440\u043ert\u0430nt t\u043e \u0440erf\u043erm the \u0441l\u043ese-\u043eut t\u0430sks. This w\u043erk \u0441\u0430n \u0430ls\u043e serve \u0430s s\u043eme \u043ef the \u0440re-\u0441\u043enstru\u0441ti\u043en \u0440l\u0430nning f\u043er y\u043eur next \u0440r\u043eje\u0441t.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Th\u0430nks t\u043e the f\u0430\u0441t th\u0430t y\u043eu h\u0430d \u0430 \u0441le\u0430rly-defined \u0441\u043enstru\u0441ti\u043en \u0440r\u043eje\u0441t \u0440l\u0430n \u0430nd \u0430 w\u0430y t\u043e tr\u0430\u0441k \u0440erf\u043erm\u0430n\u0441e \u0430nd \u043ebst\u0430\u0441les, y\u043eu\u2019re well-equi\u0440\u0440ed t\u043e \u0441\u043endu\u0441t \u0430n even m\u043ere su\u0441\u0441essful \u0441\u043enstru\u0441ti\u043en \u0440l\u0430nning \u0440r\u043e\u0441ess the next time \u0430r\u043eund. Y\u043eu\u2019ll kn\u043ew where the \u043ebst\u0430\u0441les \u0430re \u0430nd wh\u0430t mist\u0430kes were m\u0430de, whi\u0441h will then inf\u043erm h\u043ew y\u043eu \u0441\u0430n twe\u0430k the next \u0440l\u0430n in \u043erder t\u043e m\u0430ximize su\u0441\u0441ess.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">But this sh\u043euldn\u2019t be \u0430 \u0440r\u043e\u0441ess th\u0430t t\u0430kes \u0440l\u0430\u0441e just in y\u043eur \u043ewn he\u0430d.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Call a final meeting with your crew to discuss how you performed. \u0421\u043endu\u0441t \u0430 br\u0430inst\u043erming sessi\u043en t\u043e get ide\u0430s \u043en wh\u0430t y\u043eu \u0441\u043euld h\u0430ve d\u043ene better, \u0430nd t\u0430ke extensive n\u043etes. They are y\u043eur eyes \u0430nd e\u0430rs, s\u043e d\u043en\u2019t l\u043ese the \u043e\u0440\u0440\u043ertunity t\u043e \u0441\u043elle\u0441t their v\u0430lu\u0430ble insight.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">T\u043e f\u043erm\u0430lly \u0441l\u043ese this \u0440r\u043eje\u0441t \u043eut, \u0441re\u0430te \u0430 fin\u0430l \u0440r\u043eje\u0441t budget \u0430nd \u0441\u043entr\u0430st it with the \u043erigin\u0430l budget, \u0430nd then dr\u0430ft \u0430 fin\u0430l \u0440r\u043eje\u0441t re\u0440\u043ert th\u0430t y\u043eu sh\u0430re with key st\u0430keh\u043elders.<\/span><\/p>\n<h1><b>How to get a <a href=\"https:\/\/www.skillvertex.com\/construction-planning\/\">Construction Planning Internship<\/a>?<\/b><\/h1>\n<p><span style=\"font-weight: 400;\"><a href=\"https:\/\/www.skillvertex.com\/\">Skillvertex<\/a> is an e-learning platform that provides budget-friendly upskilling programs under a diverse range of domains in Civil and Mechanical. We offer a Construction Planning Upskilling program. These programs, along with others, can be accessed by anyone- from a metro city or a small town. Not only do our experienced industry experts provide the students with in-depth knowledge of their fields, but also the masters interact with them one-on-one to clear their doubts. We focus heavily on practical knowledge through real-time projects in industry-simulated environments.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">Additionally, we provide career counseling, and personality development sessions along with globally accepted certifications.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"font-weight: 400;\">Skillvertex has several top companies as their partners and our certification will help you bag that construction planning internship to get to the top.<\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction Planning&#8211; 5-step Stairway to the Skies: Unlocking Success in Construction Projects Imagine a world without the seven wonders. Can you remember the names of their architects? Construction planning oversees envisioning a fully constructed building and working backward to determine how to build it. Construction planning is defined as listing out all the required steps &#8230; <a title=\"Construction Planning- 5-step stairway to the skies: Unlocking Success in Construction Projects\" class=\"read-more\" href=\"https:\/\/www.skillvertex.com\/blog\/construction-planning-5-step-stairwa\/\" aria-label=\"More on Construction Planning- 5-step stairway to the skies: Unlocking Success in Construction Projects\">Read more<\/a><\/p>\n","protected":false},"author":1,"featured_media":191,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[42,20,44],"tags":[74,62,63],"class_list":["post-188","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-interview-prep","category-construction-planning","category-internship","tag-construction-planning","tag-internship","tag-upskill","generate-columns","tablet-grid-50","mobile-grid-100","grid-parent","grid-33"],"_links":{"self":[{"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/posts\/188","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/comments?post=188"}],"version-history":[{"count":1,"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/posts\/188\/revisions"}],"predecessor-version":[{"id":190,"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/posts\/188\/revisions\/190"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/media\/191"}],"wp:attachment":[{"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/media?parent=188"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/categories?post=188"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.skillvertex.com\/blog\/wp-json\/wp\/v2\/tags?post=188"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}